Work Order Tracking / (CM) / (HSE) - Assignments tab

Actions  | Dialogs  | Hierarchy  | Work Order  | Plans  | Assignments  | Related Records  | Actuals  | Activities  | Measurements  | Axle Configuration  | Safety Plan  | Log  | Data Sheet  | Failure Reporting  | Specifications  | Service Address

Attributes

Tab / Table / Section Attribute Remarks
Assignments   Except (Tr)
  Parent WO Parent of the work order shown in the Work Order field. When this field is blank, the work order in the Work Order field is a top-level work order. To assign a work order to a parent, select Assign to New Parent from the Select Action menu.
  Target Start Date and time the work is scheduled to begin.
  Target Finish Date and time the work is scheduled to be completed.
  Schedule Start Date the work order is targeted to begin. If the work order is generated from a PM, the date is supplied by the PM work order generation process.
  Schedule Finish Date the work order is targeted to be completed.
     
Assignments > Assignments   Table with "New Row", "Available Crew", "Available Labor" and "Complete Assignment" button. "Available Labor", "Available Crew" and "Mark Row for Delete" icon are available in every row.
Assignments > Assignments > Details   Section
  Task Identifies the task for the assignment.
  Labor Person assigned to this requirement.
  Craft Craft needed to meet this requirement.
  Crew Type Type of Crew
  Crew Identifies the crew that performed the work.
  Appointment Required Indicates if an appointment is required for the assignment.
  Skill Level Skill level assigned to the craft.
  Vendor Vendor associated with this assigned labor.
  Contract Contract number for an outside rate.
  Crew Work Group Crew Work Group
  Schedule Lock Indicates if the schedule is locked.
  Resource Lock Indicates if the resource is locked. Resource lock can only be set if a value exists in either the Labor or Crew field.
  Scheduled Start Scheduled start date and time for this assignment.
  Hours Length of time the craft is required.
  Status The status of the requirement.
  Work Zone Indicates the assignment requires resource in this work zone
     
Assignments > Location Assignments   Table with "New Row" and "Available Location" button. "Available Location" and "Mark Row for Delete" icon are available in every row.
Assignments > Location Assignments > Details    
  Location Specifies the repair facility location.
  Top Level Location Identifies the top-level parent of the repair location.
  Status Status of the repair location assignment.
  Appointment Indicates whether an appointment is scheduled.
  Appointment Required Indicates if an appointment is required for the assignment.
  Repair Location Start The date/time when the work is scheduled to begin.
  Repair Location Finish The date/time when the work is scheduled to end.
  Hours Duration of the work.
     
Assignments > Appointment Book Assignments   Table with "New Row" button. "Mark Row for Delete" icon is available in every row.
Assignments > Appointment Book Assignments > Details   Section
  Appointment Book A calendar view of the daily time slots in which an appointment for on premise work can be done.
  Appointment Window The timeframe in which an appointment can be booked.
  Location Location where the work is to be done.
  Work Zone Identifier of the work zone for the appointment book.
  Appointment Date The date of the appointment.
  Number of Appointments The number of appointments that is required to complete the work.
  Organization Organization.
  Day of the Week The pattern day for the appointment window, for example, Wednesday.
  Job Plan Job Plan for the work.